Projects

APARTMENT UPPER WEST
Location

CBD 55 Lot II.6 BSD City, Tangerang

Completion

37 months

Scope of Work

Structural, Architectural & Plumbing

Floor

2 Tower,
@ 1FL.Basement; 44FL.Upper Structure
(GFA 71,016 sqm)

Owner

PT Bumi Megah Graha Utama

Structural Consultant

PT Ketira Engineering Consultants

Architectural Consultant

PT Prima Detailindo

gallery thumb
https://www.tatamulia.co.id/contents/gallery/7W4VzQ20250624083726.jpg